Iraq energy plant for the production of vacuum asphalt and bitumen oxidizer

CLIENT:

Iraq energy general contracting ltd.

LOCATION:

holy Karbala Governorate

STRUCTURE 1:

fired vacuum heater

2 pieces

total weight 80 ton

STRUCTURE 2:

vacuum TOWER

2 pieces

total weight 85 ton

STRUCTURE 3:

HEX PLATFORM

2 pieces

total weight 80 ton

STRUCTURE 4:

TRUCK LOADING SHADE

total weight 30 ton

 

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *