manufacturing and erecting pedestrian and Maintenance Bridge on BIG ZAB-RIVER –Erbil

post-featured-image

Project name: manufacturing and erecting pedestrian and Maintenance Bridge on BIG ZAB-RIVER –Erbil.

Project area:

Weight of the structure: 40 ton.

Construction year: 2015

Project location:–Erbil

Number of staff: 38