Project name: manufacturing and erecting pedestrian and Maintenance Bridge on BIG ZAB-RIVER –Erbil.
Project area:
Weight of the structure: 40 ton.
Construction year: 2015
Project location:–Erbil
Number of staff: 38
Project name: manufacturing and erecting pedestrian and Maintenance Bridge on BIG ZAB-RIVER –Erbil.
Project area:
Weight of the structure: 40 ton.
Construction year: 2015
Project location:–Erbil
Number of staff: 38